Friday, December 11, 2009

Eaves Trough Is On.

The eaves trough was finally installed this week, and it looks pretty nice. It is a seamless product and rather than the standard tin, they used steel because of the steel roof choice. We buried "big O" to drain into the field to the south of us and the eaves drains directly into that, so we hope that there will not be a huge amount of drainage mess in the spring.

The laundry room has its last coat of mud and should be ready for paint on Saturday, hopefully next week we can get the final coats on in the upstairs hall as well. The shower glass for the upstairs bathroom should be finished this week as well.

No comments:

Post a Comment